{"id":267,"date":"2014-08-07T16:05:52","date_gmt":"2014-08-07T16:05:52","guid":{"rendered":"https:\/\/iesinspection.com\/?page_id=267"},"modified":"2016-12-02T12:02:07","modified_gmt":"2016-12-02T12:02:07","slug":"non-destrutive-testing-projects","status":"publish","type":"page","link":"https:\/\/iesinspection.com\/?page_id=267","title":{"rendered":"Non Destructive Testing Projects"},"content":{"rendered":"<div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"background-color: #ffffff;background-position: left top;background-repeat: no-repeat;padding-top:20px;padding-right:0px;padding-bottom:20px;padding-left:0px;margin-bottom: 0px;margin-top: 0px;border-width: 0px 0px 0px 0px;border-color:#eae9e9;border-style:solid;\" ><div class=\"fusion-builder-row fusion-row\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_1 1_1 fusion-one-full fusion-column-first fusion-column-last\" style=\"margin-top:0px;margin-bottom:20px;\"><div class=\"fusion-column-wrapper fusion-flex-column-wrapper-legacy\" style=\"background-position:left top;background-repeat:no-repeat;-webkit-background-size:cover;-moz-background-size:cover;-o-background-size:cover;background-size:cover;padding: 0px 0px 0px 0px;\"><div class=\"fusion-text fusion-text-1\"><h2>Our service is carried out during the construction and maintenance of steel supported structures, for example&#8230;<\/h2>\n<p>Heathrow Terminals T2A,T2B,T3iB, T4, T5A, B &amp; C, Terminal 5 \/ M25 Entry Bridge, Borough Viaduct Bridge, The Francis Crick Institute and the Lyric Theatre in Hammersmith, Stratford Olympic Bridge to the Westfield Shopping Centre, White City and Shepherds Bush shopping Centre and more recently The New London Embassy and The Leadenhall Building. Western Link Project &#8211; structural transformer support buildings at Flintshire Bridge and Hunterston Converter Station, Walpole, Norwich Main onshore sub-stations.<\/p>\n<p>We also conduct inspection and surveillance operations during the construction of off-shore platforms that are being built for the renewable energy\u00a0 and oil &amp; gas sector.<\/p>\n<p><strong>As an example, our welding engineers, technicians and inspectors have been involved and worked on the following projects:-<\/strong><\/p>\n<\/div><div class=\"fusion-clearfix\"><\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-1 fusion_builder_column_1_1 1_1 fusion-one-full fusion-column-first fusion-column-last fusion-column-no-min-height\" style=\"margin-top:0px;margin-bottom:0px;\"><div class=\"fusion-column-wrapper fusion-flex-column-wrapper-legacy\" style=\"background-position:left top;background-repeat:no-repeat;-webkit-background-size:cover;-moz-background-size:cover;-o-background-size:cover;background-size:cover;padding: 0px 0px 0px 0px;\"><div class=\"fusion-sep-clear\"><\/div><div class=\"fusion-separator fusion-full-width-sep\" style=\"margin-left: auto;margin-right: auto;width:100%;\"><\/div><div class=\"fusion-sep-clear\"><\/div><div class=\"fusion-clearfix\"><\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-2 fusion_builder_column_1_2 1_2 fusion-one-half fusion-column-first\" style=\"width:48%; margin-right: 4%;margin-top:0px;margin-bottom:20px;\"><div class=\"fusion-column-wrapper fusion-flex-column-wrapper-legacy\" style=\"background-position:left top;background-repeat:no-repeat;-webkit-background-size:cover;-moz-background-size:cover;-o-background-size:cover;background-size:cover;padding: 0px 0px 0px 0px;\"><div class=\"fusion-text fusion-text-2\"><h2>Wind Farm, renewable energy sector offshore platform builds&#8230;<\/h2>\n<p>Gabbard &#8211; Siemens<\/p>\n<p>Galloper OSP &#8211; Siemens<\/p>\n<p>Thanet OSP &#8211; Siemens<\/p>\n<p>Lincs OSP &#8211; Siemens<\/p>\n<p>Dudgeon OSP &#8211; Siemens<\/p>\n<p>Gwynt Y Mor North and South &#8211; Siemens<\/p>\n<p>Nordsee-Ost OSP &#8211; Siemens Germany SAG<\/p>\n<p>Siemens\u00a0 &#8211; Weld engineering, weld procedure review &amp; approval.<\/p>\n<\/div><div class=\"fusion-clearfix\"><\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-3 fusion_builder_column_1_2 1_2 fusion-one-half fusion-column-last\" style=\"width:48%;margin-top:0px;margin-bottom:20px;\"><div class=\"fusion-column-wrapper fusion-flex-column-wrapper-legacy\" style=\"background-position:left top;background-repeat:no-repeat;-webkit-background-size:cover;-moz-background-size:cover;-o-background-size:cover;background-size:cover;padding: 0px 0px 0px 0px;\"><div class=\"fusion-text fusion-text-3\"><h2>Oil &amp; Gas and petrochemical sector: On &amp; Offshore maintenance inspection:-<\/h2>\n<p>Rankin A<\/p>\n<p>Goodwyn A<\/p>\n<p>Wandoo<\/p>\n<p>Varanus Island Gas plant &#8211; construction and maintenance<\/p>\n<p>Barrow Island &#8211; oil pipeline maintenance inspection<\/p>\n<p>Thevenard Island &#8211; gas plant maintenance inspection<\/p>\n<p>Kvaerner &#8211; offshore module construction inspection &#8211; weld engineering and inspection<\/p>\n<p>TAG (Tees Alliance Group) &#8211; offshore module construction &#8211; weld engineering and inspection<\/p>\n<p>Wilton Engineering &#8211; weld engineering<\/p>\n<p>Brunei LNG &#8211; LNG tank piping upgrade<\/p>\n<p>NZRC &#8211; Full plant shutdown and maintenance<\/p>\n<p>ENI &#8211; Block 15\/06 Angola Block PLET, weld procedure process approval,modules, process equipment, piping projects<\/p>\n<p>ENI &#8211; Block 15\/06 Angola Block East Hub, weld procedure process approval,modules, process equipment, piping projects<\/p>\n<p>Hyundai Engineering &#8211; ASC Indonesia &#8211; plant upgrade, Arna and Mirfa Projects &#8211; Pump and valve equipment.<\/p>\n<p>Balmoral Offshore Engineering &#8211; Modules<\/p>\n<\/div><div class=\"fusion-clearfix\"><\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-4 fusion_builder_column_1_1 1_1 fusion-one-full fusion-column-first fusion-column-last fusion-column-no-min-height\" style=\"margin-top:0px;margin-bottom:0px;\"><div class=\"fusion-column-wrapper fusion-flex-column-wrapper-legacy\" style=\"background-position:left top;background-repeat:no-repeat;-webkit-background-size:cover;-moz-background-size:cover;-o-background-size:cover;background-size:cover;padding: 0px 0px 0px 0px;\"><div class=\"fusion-sep-clear\"><\/div><div class=\"fusion-separator fusion-full-width-sep\" style=\"margin-left: auto;margin-right: auto;width:100%;\"><\/div><div class=\"fusion-sep-clear\"><\/div><div class=\"fusion-clearfix\"><\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-5 fusion_builder_column_1_2 1_2 fusion-one-half fusion-column-first\" style=\"width:48%; margin-right: 4%;margin-top:0px;margin-bottom:20px;\"><div class=\"fusion-column-wrapper fusion-flex-column-wrapper-legacy\" style=\"background-position:left top;background-repeat:no-repeat;-webkit-background-size:cover;-moz-background-size:cover;-o-background-size:cover;background-size:cover;padding: 0px 0px 0px 0px;\"><div class=\"fusion-text fusion-text-4\"><h2>FPSO &#8211; construction and maintenance projects:-<\/h2>\n<p>Griffin Venture &#8211; BHPP (Billiton)<\/p>\n<p>Northern Endeavour (Enterprise) &#8211; Woodside<\/p>\n<p>BUMI Armada<\/p>\n<p>Ghana OCTP SPS<\/p>\n<h2>Sub-sea pipeline construction inspection:-<\/h2>\n<p>Semac 1 &#8211; Nam Con Son &#8211;\u00a0 sub-sea pipe-lay project Vietnam &#8211; BP<\/p>\n<p>Java Constructor &#8211; Wonnich &#8211; sub-sea pipe-lay project Australia &#8211; Apache Energy<\/p>\n<p>Allseas Audacia\u00a0 &#8211; sub-sea pipe-lay project Australia &#8211; Pluto &#8211;\u00a0 Woodside<\/p>\n<p>ENI &#8211; Block 15\/06 Angola Block &#8211; Pipeline coating procedure approval<\/p>\n<\/div><div class=\"fusion-clearfix\"><\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-6 fusion_builder_column_1_2 1_2 fusion-one-half fusion-column-last\" style=\"width:48%;margin-top:0px;margin-bottom:20px;\"><div class=\"fusion-column-wrapper fusion-flex-column-wrapper-legacy\" style=\"background-position:left top;background-repeat:no-repeat;-webkit-background-size:cover;-moz-background-size:cover;-o-background-size:cover;background-size:cover;padding: 0px 0px 0px 0px;\"><div class=\"fusion-text fusion-text-5\"><h2>Waste Management processing facilities (new Build):-<\/h2>\n<p>Costain\/Alphaplus<\/p>\n<p>Reliance Street &#8211; Viridor<\/p>\n<p>Bredbury &#8211; Greater Manchester Waste Disposal Authority (GMWDA)<\/p>\n<p>Glasgow &#8211; Waste Facility piping project<\/p>\n<p>Wakefield LIP &#8211; Shanks\/Wakefield<\/p>\n<p>Cobden Street &#8211; Recycling Facility &#8211; Tank upgrade &#8211; Salford City Council<\/p>\n<h2>Marine Inspection:-<\/h2>\n<p>Perform routine NDT operations on HMAS ships that come into Garden Island, Western Australia (For PNDT)<\/p>\n<p>Ship Thickness surveys and inspections on behalf of Lloyds, DNV,BV,US Coastguards, ABS etc.<\/p>\n<p>We are also involved with the mining and marine sectors and are still growing with the intention of gaining new contracts within different sectors including Nuclear power plant construction and shut downs.<\/p>\n<p>If you would like to discuss further or have any immediate inspection requirements or require any further information please contact\u00a0 07964 036 135 or via email at\u00a0 david.burke@iesinspection.com.<\/p>\n<\/div><div class=\"fusion-clearfix\"><\/div><\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/iesinspection.com\/index.php?rest_route=\/wp\/v2\/pages\/267"}],"collection":[{"href":"https:\/\/iesinspection.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/iesinspection.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/iesinspection.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/iesinspection.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=267"}],"version-history":[{"count":7,"href":"https:\/\/iesinspection.com\/index.php?rest_route=\/wp\/v2\/pages\/267\/revisions"}],"predecessor-version":[{"id":12560,"href":"https:\/\/iesinspection.com\/index.php?rest_route=\/wp\/v2\/pages\/267\/revisions\/12560"}],"wp:attachment":[{"href":"https:\/\/iesinspection.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=267"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}