{"id":13559,"date":"2019-01-17T14:38:00","date_gmt":"2019-01-17T14:38:00","guid":{"rendered":"https:\/\/iesinspection.com\/infrasense-evaluates-condition-of-stone-arch-bridge\/"},"modified":"2019-01-17T14:38:00","modified_gmt":"2019-01-17T14:38:00","slug":"infrasense-evaluates-condition-of-stone-arch-bridge","status":"publish","type":"post","link":"https:\/\/iesinspection.com\/?p=13559","title":{"rendered":"Infrasense Evaluates Condition of Stone Arch Bridge"},"content":{"rendered":"<p>In July of 2018, Infrasense mobilized a two-man team to perform a ground coupled GPR survey of the road surface on a stone arch bridge in Orange, CT. With the help of a traffic control unit and a local police officer, the condition survey was carried out during overnight hours with minimal disruption to traffic. <\/p>\n<p>The survey implemented a ground coupled 900-MHz antenna and SIR-4000 control unit manufactured by GSSI, Inc. of Nashua, NH. The antenna was maneuvered across the roadway surface of the bridge in&#013;<br \/>\nSource: NDT<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In July of 2018, Infrasense mobilized a two-man team to perform a ground coupled GPR survey of the road surface on a stone arch bridge in Orange, CT. With the help of a traffic control unit and a local police officer, the condition survey was carried out during overnight hours with minimal disruption to traffic. The [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"false","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[45],"_links":{"self":[{"href":"https:\/\/iesinspection.com\/index.php?rest_route=\/wp\/v2\/posts\/13559"}],"collection":[{"href":"https:\/\/iesinspection.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/iesinspection.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/iesinspection.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/iesinspection.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=13559"}],"version-history":[{"count":0,"href":"https:\/\/iesinspection.com\/index.php?rest_route=\/wp\/v2\/posts\/13559\/revisions"}],"wp:attachment":[{"href":"https:\/\/iesinspection.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=13559"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/iesinspection.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=13559"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/iesinspection.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=13559"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}