{"id":13713,"date":"2019-06-20T17:15:00","date_gmt":"2019-06-20T16:15:00","guid":{"rendered":"https:\/\/iesinspection.com\/new-generation-of-m2m-gekko-officially-released\/"},"modified":"2019-06-20T17:15:00","modified_gmt":"2019-06-20T16:15:00","slug":"new-generation-of-m2m-gekko-officially-released","status":"publish","type":"post","link":"https:\/\/iesinspection.com\/?p=13713","title":{"rendered":"New Generation of M2M Gekko&#x2122; Officially Released"},"content":{"rendered":"<p>Les Ulis, France, June 19th, 2019 \u2014 Eddyfi Technologies is proud to announce the release of the new generation of M2M Gekko, the state-of-the-art phased array flaw detector.<\/p>\n<p>Launched in December 2013, the first Gekko generation has brought a wind of change to the NDT market by offering embedded real-time TFM in addition to beam-forming phased array and conventional UT technology through a modern intuitive software interface. <\/p>\n<p>Built on the strength of its predecessor, the new Gekko generation benefits&#013;<br \/>\nSource: NDT<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Les Ulis, France, June 19th, 2019 \u2014 Eddyfi Technologies is proud to announce the release of the new generation of M2M Gekko, the state-of-the-art phased array flaw detector. Launched in December 2013, the first Gekko generation has brought a wind of change to the NDT market by offering embedded real-time TFM in addition to beam-forming phased [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"false","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[45],"_links":{"self":[{"href":"https:\/\/iesinspection.com\/index.php?rest_route=\/wp\/v2\/posts\/13713"}],"collection":[{"href":"https:\/\/iesinspection.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/iesinspection.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/iesinspection.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/iesinspection.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=13713"}],"version-history":[{"count":0,"href":"https:\/\/iesinspection.com\/index.php?rest_route=\/wp\/v2\/posts\/13713\/revisions"}],"wp:attachment":[{"href":"https:\/\/iesinspection.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=13713"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/iesinspection.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=13713"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/iesinspection.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=13713"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}