{"id":14880,"date":"2024-06-01T05:32:00","date_gmt":"2024-06-01T04:32:00","guid":{"rendered":"https:\/\/iesinspection.com\/?p=14880"},"modified":"2024-06-01T05:32:00","modified_gmt":"2024-06-01T04:32:00","slug":"oceaneering-conducts-freedom-auv-pipeline-inspection","status":"publish","type":"post","link":"https:\/\/iesinspection.com\/?p=14880","title":{"rendered":"Oceaneering Conducts Freedom&#x2122; AUV Pipeline Inspection"},"content":{"rendered":"<p>Paris, France and Houston, Texas \u2013 Today, TotalEnergies and Oceaneering International, Inc. announced that the Freedom&#x2122; Autonomous Underwater Vehicle (AUV) has completed a Pipeline Inspection Industrial Pilot, demonstrating its capabilities for sustainable commercial pipeline inspection missions.<\/p>\n<p>The capabilities observed during the pilot delivered on the ambition of TotalEnergies to reduce the environmental impact while assuring the integrity of sub-marine pipelines, contributing to TotalEnergies ambiti&#013;<br \/>\nSource: NDT<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Paris, France and Houston, Texas \u2013 Today, TotalEnergies and Oceaneering International, Inc. announced that the Freedom&#x2122; Autonomous Underwater Vehicle (AUV) has completed a Pipeline Inspection Industrial Pilot, demonstrating its capabilities for sustainable commercial pipeline inspection missions. The capabilities observed during the pilot delivered on the ambition of TotalEnergies to reduce the environmental impact while assuring the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"false","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[],"tags":[45],"_links":{"self":[{"href":"https:\/\/iesinspection.com\/index.php?rest_route=\/wp\/v2\/posts\/14880"}],"collection":[{"href":"https:\/\/iesinspection.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/iesinspection.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/iesinspection.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/iesinspection.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=14880"}],"version-history":[{"count":0,"href":"https:\/\/iesinspection.com\/index.php?rest_route=\/wp\/v2\/posts\/14880\/revisions"}],"wp:attachment":[{"href":"https:\/\/iesinspection.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=14880"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/iesinspection.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=14880"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/iesinspection.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=14880"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}